FDOT is resurfacing a quarter-mile section of road at the intersection of SR 426 (Aloma) and SR 436 (Semoran) in Winter Park [GMap].
The construction will cause the closure of two right/through lanes, making them full-stop, controlled right-turn lanes. New curbs, ADA curb ramps, and added pedestrian features and median modifications will be added.
The total cost of the project is estimated at $1.174M and is expected to be complete this spring.