A developer has filed for a Conditional Use Permit to build out a parcel in the SoDo District, at the corner of South Orange and Hollenbeck Street [GMap].

The project would replace the existing building with a 5,700 SF retail/restaurant space with parking placed out back. The following designs were drafted by BHM Architecture (Website). If there are any tenants signed up for this building, they have not been named at this time.

The project is scheduled for a public hearing at the Municipal Planning Board on February 21, 2017 at 8:30 a.m.

1

1

Brendan O'Connor

Editor in Chief of Bungalower.com

Join the Conversation

2 Comments

Have something to say? Type it below. Holding back can give you pimples.

This site uses Akismet to reduce spam. Learn how your comment data is processed.